FN-01 · Deputy, Indiana

Residential Foundation Assessment

Stair-step brick cracking and a sticking door after a wet season — settlement versus finish movement.

01

The Concern

The homeowner noticed stair-step cracks in the brick veneer and a door that had started to bind after a stretch of heavy rain. A contractor had already quoted helical piers.

02

The Inspection

Bob reviewed the interior and exterior foundation, crack width and direction, floor level, drainage at the footing, and how the veneer was detailed over the structure. He looked at whether the movement was in the finish, the foundation, or both.

03

The Finding

The pattern was consistent with moisture-related movement at the footing rather than a failed foundation wall. Interior finishes were largely intact. The structure was carrying load; the veneer was recording seasonal and drainage-related movement.

04

Recommendation

Correct the water at the foundation first. Monitor the cracks. Piers were not indicated based on what the structure was doing. A written letter documented the finding for the homeowner.

Foundation wall at grade during a structural inspectionField photo · representative

Need an inspection scheduled?

Call and we answer questions directly — no sales pitch. We return every message within 15 minutes.

Call (812) 595-3003